Tigard, OR · Zoning rules · Updated 2026

Tigard ADU Rules — Stricter Than Portland

Tigard caps ADUs at the lesser of 50% of primary dwelling or 800 SF. Many properties with 'Portland' mailing addresses (ZIP 97223, 97224) are actually inside Tigard's jurisdiction and follow this stricter rule.

The rule

Tigard caps ADUs at the lesser of 50% of primary dwelling or 800 SF.

85% verified

Source: Tigard CDC 18.220.040

How big can your ADU be?

Primary dwellingMaximum ADU sizeADU as % of primary
1,000 SF house500 SF50%
1,500 SF house750 SF50%
2,000 SF house800 SF40%
2,500 SF house800 SF32%
3,500 SF house800 SF23%

Sizes reflect the code rule only. Site-specific setbacks, coverage limits, and overlay zones may reduce buildable envelope further.

Analyze your specific Tigard property

Drop an address to see the exact ADU size your lot allows, plus fourplex, cottage cluster, and middle-housing options. Includes construction cost estimates, exit values, ROI, and cited code sections for every constraint.

Analyze a Tigard address

Beyond the ADU rule

Setbacks + lot coverage

Each zoning district has its own front, side, and rear setbacks plus a lot-coverage cap. Our analyzer applies your zone’s actual limits automatically.

Parking requirements

Many jurisdictions have reduced ADU parking mandates under state law. We flag when your lot requires additional parking spaces.

Overlay zones

Historic districts, floodplains, and design-review overlays can override base zoning. We check the current overlay map for your specific address.

SDCs + permit fees

System Development Charges vary by jurisdiction and ADU size. Fees included in our cost estimates.

Other cities we cover

Zoning rules from municipal code. Last reviewed 2026-05. Not a substitute for permit-stage verification with the city planning department.